In this photo provided by the Intrepid Sea, Air & Space Museum, line handler Rafael Ramero carries the lines as the Intrepid aircraft carrier moves into the dry dock at Bayonne Dry Dock & Repair Corp. in Bayonne, N.J., to begin the first stage of its refurbishment, Tuesday, April 10, 2007. The Intrepid is expected to be in dry dock for approximately 60 to 75 days while it's hull and flight deck are repainted. (AP Photo/Intrepid Sea, Air & Space Museum/Stuart Ramson)
Download